|
Material
Pole: 3” O.D. structural and mechanical tubular steel.
Ash Bowl
Steel Sheet
Finish
Corrosion inhibiting primer coat followed by a t hermosetting TGIC polyester powder coat.
Installation
Surface Flange mounted or embedded. Designate either “-F” or “-P” after the mounting designated for a surface flanged mounted or embedded mount respectively. Access
Ash urn top is hinged for access to the interior bowl.
|